In an ISO 27001 certification audit, a major nonconformity is a failure that affects the ability of the ISMS to achieve its intended results, such as a requirement not addressed at all or a control that has broken down entirely. It must be corrected, and the correction verified, before a certificate is issued or maintained. A minor nonconformity is a lapse that does not undermine the system as a whole; you submit a corrective action plan, and the auditor checks it at the next audit. Opportunities for improvement are suggestions, not findings you must act on.

How certification bodies classify findings

Definitions come from the certification body's rules, based on ISO/IEC 17021-1. The wording varies slightly between bodies, but the logic is consistent.

  • Major nonconformity: the absence of, or total breakdown of, a system to meet a requirement; or a situation that raises significant doubt about the ISMS achieving its intended outcomes. Several related minor findings in the same area can also be raised as a major.
  • Minor nonconformity: a single lapse or partial failure that does not, on its own, raise significant doubt about the ISMS as a whole.
  • Opportunity for improvement: an observation where the auditor sees a way to do better, without a requirement being missed.

Typical examples

These are illustrative; the auditor's judgement in context decides the grade.

  • Major: no internal audit carried out before certification; no management review; no risk assessment covering part of the scope; a key control described in the SoA that does not exist at all.
  • Minor: one leaver whose access was removed late; a policy overdue for its annual review; a supplier assessment missing for one supplier; training records incomplete for two new starters.
  • Opportunity: suggesting metrics for objectives be reported more frequently; recommending an automated offboarding workflow.

What each means for certification

At initial certification, major nonconformities block the certificate until you have corrected them and the certification body has verified the correction, sometimes by a follow-up visit, sometimes by reviewing evidence remotely. Certification bodies set time limits for this, commonly a few months. Minor nonconformities do not block the certificate, provided you submit an acceptable corrective action plan; implementation is checked at the next surveillance audit.

During surveillance, an unresolved major nonconformity can lead to suspension of the certificate. Repeating minor nonconformities on the same issue can be escalated to a major.

Correction versus corrective action

Clause 10.2 distinguishes the two, and auditors expect both.

  • Correction: fixing the immediate problem, for example removing the leaver's access today.
  • Root cause analysis: finding why it happened, for example offboarding depends on a manual email from HR that was missed.
  • Corrective action: changing the process so it does not recur, for example linking account removal to the HR system's leaver workflow.
  • Effectiveness check: confirming later that the action worked, for example sampling leavers over the next quarter.

Writing a good response

A strong nonconformity response is short and evidence-based. State the finding in your own words, describe the immediate correction with evidence, explain the root cause, describe the corrective action with an owner and date, and say how you will check it worked. Avoid blaming individuals; auditors want to see process changes, not reprimands. Submit within the certification body's deadline.

Reducing findings before the audit

Most nonconformities are found by a good internal audit first. Run it early enough to fix findings, sample records the way a certification auditor would, and check that every control in the SoA has evidence. Our posts on ISO 27001 internal audit and Stage 1 and Stage 2 audits explain how, and our ISO 27001 service includes a mock audit.

Disagreeing with a finding

If you believe a finding is wrong or wrongly graded, raise it at the closing meeting with evidence, calmly and specifically. Auditors can and do revise findings when shown evidence they missed. If disagreement remains, certification bodies have a formal appeals process. Use it sparingly; most disputes are resolved by showing the evidence or clarifying the requirement.

Internal audit findings use the same grades

Grade internal audit findings the same way a certification body would. It helps management see which issues could block certification and focuses effort where it matters most before the external audit.

Keeping a nonconformity log

Record every nonconformity, from internal and external audits, incidents and complaints, in one log with the finding, grade, root cause, actions, owners, dates and effectiveness check. Review it in management review. A well-kept log is itself evidence of a working ISMS, and auditors often start their review there.

Frequently asked questions

What is a major nonconformity in ISO 27001?

A finding where a requirement is not addressed or a system has broken down, raising significant doubt about the ISMS achieving its intended results.

Can I get ISO 27001 certified with a major nonconformity?

Not until it is corrected and the certification body has verified the correction.

What happens with minor nonconformities?

You submit a corrective action plan; the certificate can be issued, and implementation is checked at the next audit.

What is the difference between correction and corrective action?

Correction fixes the immediate problem; corrective action addresses the root cause so it does not happen again.

Find nonconformities before the auditor does

We run a mock audit against the standard and help you close findings with corrective actions that last.